080515013 New lefthand mainline crossover has been installed north of the bridge at BNSF Northtown CTC 44th         
Upcoming work will cut mainline "S-curve" and reconnect to straight routes. Workers under umbrella in foreground appear to be installing an insulated rail joint.
Date: 5/15/2008 Location: Minneapolis, MN   Map Show Minneapolis on a rail map Views: 252 Collection Of:   The Slidebroker image by John Hill
Author:  John Hill
080515013 New lefthand mainline crossover has been installed north of the bridge at BNSF Northtown CTC 44th
Picture Categories: Yard,Track This picture is part of album:  2008 Twin Cities Trackwork Projects
Share
User Comments Contributor does not allow comments on their photos.
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=1161608