080716002 CPs ex-MN&S bridge replacement project over Minnetonka Blvd.         
Old MN&S bridge is gone. New span has been slid into position and sits on it's permanent bridge shoes. Excavator is digging excess fill material from old abutment and regrading the fill. New track alignment will sit several feet east of it's old position
Date: 7/16/2008 Location: Saint Louis Park, MN   Map Show Saint Louis Park on a rail map Views: 208 Collection Of:   The Slidebroker image by John Hill
Author:  John Hill
080716002 CPs ex-MN&S bridge replacement project over Minnetonka Blvd.
Picture Categories: Bridge This picture is part of album:  2008 Twin Cities Trackwork Projects
Share
User Comments Contributor does not allow comments on their photos.
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=1243686