080911010 BNSF Mississippi River East bridge project on Wayzata Sub.         
First old steel span has been removed and replaced with 4 precast concret girders for new ballasted deck bridge
Date: 9/11/2008 Location: Minneapolis, MN   Map Show Minneapolis on a rail map Views: 137 Collection Of:   The Slidebroker image by John Hill
Author:  John Hill
080911010 BNSF Mississippi River East bridge project on Wayzata Sub.
Picture Categories: Bridge,Track This picture is part of album:  2008 Twin Cities Trackwork Projects
Share
User Comments Contributor does not allow comments on their photos.
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=1313438