080922003 BNSF Mississippi River East bridge project on Wayzata Sub.
New concrete bridge appears almost complete with cantilever walkway work, and welding those panel track joints remaining.
Date:
9/22/2008
Location:
Minneapolis, MN
Map
Views:
135
Collection Of:
The Slidebroker image by John Hill
Author:
John Hill
Picture Categories: Bridge,Track
This picture is part of album:
2008 Twin Cities Trackwork Projects
Share
User Comments
Contributor does not allow comments on their photos.
Link to this page:
http://www.rrpicturearchives.net/showPicture.aspx?id=1327005