081003021 BNSF Mississippi River East bridge project on Wayzata Sub.         
Rock causeway in middle of river has been dug out, restoring prior water flow pattern. Temporary ramp down to river has been regraded, seeded and covered with straw.
Date: 10/3/2008 Location: Minneapolis, MN   Map Show Minneapolis on a rail map Views: 150 Collection Of:   The Slidebroker image by John Hill
Author:  John Hill
081003021 BNSF Mississippi River East bridge project on Wayzata Sub.
Picture Categories: Bridge,Track This picture is part of album:  2008 Twin Cities Trackwork Projects
Share
User Comments Contributor does not allow comments on their photos.
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=1338904