After waiting about 5 hours. NS 400 finally makes its way through the New CP Altoona. Note the Eastbound Slope Signal Bridge sitting against the embankment in the background. |
Date:
6/16/2012 |
Location:
Altoona(CP Slope), PA |
Views:
566 |
Collection Of:
Dustin Faust |
Locomotives: |
Author: Dustin Faust
|
|
Picture Categories: Signal,Action |
This picture is part of album: Closing ALTO Tower |