BNSF 3660 Has Been Pushed Back into The Load 1 Bay for Engine Run tests. The Transfer Dolly and Bobcat (Pushes the Locomotives into the Wabtec Bays) are in the Foreground.
Date:
7/15/2023
Location:
Fort Worth ITC, Fo
Map
Views:
79
Collection Of:
PAUL KEOGH
Author:
PAUL KEOGH
Picture Categories: Roster,Track
This picture is part of album:
2 Brand New Undelivered Locomotives!!!
Share
User Comments
No Comments on this picture
Add a Comment:
Please
Log in
to leave a Comment.
Link to this page:
http://www.rrpicturearchives.net/showPicture.aspx?id=6085509