SP manifest rolls downgrade past partially reconfigured right-of-way         
Caliente Creek is visible on the far side of the tracks.
Date: 4/23/1985 Location: Ilmon, CA   Map Show Ilmon on a rail map Views: 184 Collection Of:   Steve Schmollinger
Author:  Steve Schmollinger
SP manifest rolls downgrade past partially reconfigured right-of-way
Picture Categories: Scenic,Track,Action This picture is part of album:  SP on Tehachapi
Share
User Comments No Comments on this picture
Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=937462