|
Title: |
SP 7462 added to the point |
Description: |
Brakeman signals the joint. Next, he'll hook up the "weenies." Looks like enough power to make the hill today. |
Photo Date: |
6/30/1987 Upload Date: 5/11/2018 4:05:00 PM |
Location: |
Truckee, CA |
Author: |
Bruce Flaws |
Categories: |
|
Locomotives: |
SP 7462(SD45R) SP 8544(SD40T-2) SP 8340(SD40T-2) |
Views: |
297 Comments: 0 |
|
|
|
Title: |
Road-switching action |
Description: |
SP 7642 was the helper on the EB in the siding at left. It will add the cars from the WB siding to the EB train, then add the caboose (seen in another pic here), and eventually assume the point of the WB. |
Photo Date: |
6/30/1987 Upload Date: 5/11/2018 4:19:32 PM |
Location: |
Truckee, CA |
Author: |
Bruce Flaws |
Categories: |
|
Locomotives: |
SP 7462(SD45R) SP 8544(SD40T-2) |
Views: |
224 Comments: 0 |
|
|
|
Title: |
SP 7462 |
Description: |
Switching action. I never thought those lumber loads looked very stable. |
Photo Date: |
6/30/1987 Upload Date: 5/11/2018 4:30:19 PM |
Location: |
Truckee, CA |
Author: |
Bruce Flaws |
Categories: |
|
Locomotives: |
SP 7462(SD45R) SP 8544(SD40T-2) |
Views: |
216 Comments: 0 |
|
|
|